top of page
Quantity Surveying
BIM Quantity Take-Off (QTO) with HKSMM
Application:
-
Pre-Tender measurement / re-measurement for lump-sum contract with drawings and specifications
-
Specialize in re-bar measurement
-
Efficient and accurate QTO submission before tender return
-
QTO based on BIM knowledge
-
Provide 3D BIM model except measurement breakdown
Case Sharing: Disputes over Interim Payments / Final Accounts
-
Main Contractor intended to re-measure the work done with accurate information within a short period of time
-
Main contractor employed B-BIM for quantities re-measurements
-
B-BIM provided a detailed breakdown of quantities within 2 weeks
-
Main contractor was convinced by the re-measurements and agreed on quantities re-measured by B-BIM
-
Disputes have been settled and sub-contractor resumed to work